How does the Sequence number work in Product Engine for the Production Option items?

Question: How does the Sequence number work in Production for the Option items ?
 
 
Answer: The Sequence field located in the rightmost part of the Production window controls the sequence of the production steps that will appear on the job ticket. After entering a Production step you have to enter what sequence number a production step will appear on the job ticket, beginning with number 1. 
 
 

 
For example, the first step of your workflow after receiving order requires the files to be checked or the Pre-flight process, you have to enter 1 on the Sequence field for it to appear as the first step on the job ticket.
 
If you have questions or need help, please open a support ticket by selecting this link Aleyant Support